VortexMax connects hyperscalers, colocation providers, and data center operators with premium infrastructure — transformers, cooling systems, and modular units — sourced globally and engineered for deployment.
US hyperscalers face 18–24 month lead times on critical equipment. VortexMax bridges that gap with proven global sourcing, factory-tested equipment, and end-to-end project management.
Direct supplier relationships in China, Europe, and Southeast Asia
All equipment IEC, IEEE, and UL certified, factory tested before shipment
Compressed lead times vs traditional channels — 30–50% faster
From spec to commissioning — single-source accountability
Full logistics, customs, and compliance management included
20–35% cost advantage through direct manufacturer partnerships
US Data Center CapEx projected by 2030
Epoxy-cast dry-type transformers engineered for hyperscale data center environments. Zero oil risk, minimal maintenance, and AI-workload optimized power handling.
Class F/H insulation, IP54 rated, suitable for harsh environments
Field-installable without power shutdown; ideal for retrofits
Designed for non-linear GPU/HPC loads with low harmonic distortion
Switchgear integration packages with protection relays included
Liquid and air-based precision cooling engineered for 40–144 kW/rack AI compute density. Designed to match hyperscale deployment timelines.
Precision air cooling for mixed-density rows, 20–60 kW/rack
Cold plate DLC for GPU/ASIC servers at 80–144 kW rack density
Total immersion for extreme AI workloads, PUE as low as 1.03
Retrofittable rear-door heat exchangers for existing facilities
Factory-built, plug-and-play data center modules shipped fully integrated and commissioned. Deploy in 6–10 weeks vs 18+ months for traditional build.
Power, cooling, IT space in a single skid-mounted enclosure
ISO container-based, deployable on any prepared pad or rooftop
Add-on pods that integrate with existing plant infrastructure
10–50 kW edge modules for distributed compute at cell towers, substations
Direct relationships with industry leaders — no middlemen, full factory accountability.
Global top-5 transformer manufacturer · 30+ years · 90+ countries
Precision cooling innovator · Founded 2008 · AI-native cooling solutions
Load analysis, site survey, and requirements scoping with our engineering team
Customized equipment specifications, single-line diagrams, and project BOM
Factory order placement with TBEA and BrightRay, production tracking
Factory acceptance testing, third-party inspection, and certification review
Freight, customs clearance, site delivery, and commissioning support
Whether you're planning a greenfield build, upgrading capacity, or need equipment fast — our team is ready.
Tell us about your project — power capacity needs, rack density targets, site location, and timeline. Our infrastructure specialists will respond with product recommendations and pricing.